Examples of projects carried out during the last 15 years in the pharmaceutical industry:
The
MERIAL (Gerland)
- Detail studies for the development of premises and equipment existing in different areas,
- Assist in project management for consultations, follow-up and work on lots "vats and skids", "Salles Blanches", Electricity-Automation, Piping-Utilities,
- Realization of part of the stainless steel work (pipes and skids).
MERIAL (Lentilly)
- Turnkey service for replacement of NEP-SEP pipes / fittings & Transfer line as specified in the CCTP.
MERIAL (Saint Priest)
- Update of a Basic Study carried out in 2010 for the installation of an additional freeze-dryer in an existing building. The objective was to establish a planning and a budget for the operation.
GENZYME (Gerland) & SKYEPHARMA (Saint Quentin Fallavier)
- Several revamping processes and Utilities,
- Several modification of Process and Utilities equipment,
- Supply of specific parts and equipment and / or custom-made Process and Utilities.
The
ABBOTT (Châtillon sur Chalaronne)
- Studies, supply, installation and commissioning of piping networks Process and an effluent treatment plant.
SANOFI PASTEUR (Marcy l'Etoile)
- Acquisition of an APS concerning 2 border washing machines and a border washing room with a view to drawing up a list of consulting,
- Skid (piping and boiler making) for the addition of a complexing agent on fermenters: studies, pre-fabrication, commissioning, SAT.
Home
SANOFI PASTEUR (Neuville / Saône)
Project Defi-Vrac: - Assistance to project owner,
- Study for the production of a skid for the production of cooling water and the associated distribution loop.
ENDRESS + HAUSER
- Study and realization of a support for laboratory bench-top flowmeter for SANOFI.
RHEOMIX (Genas):
- FAT dynamics of a tank of 100L and sib skid for VIRBAC.
2005-2009
MERIAL (Gaborone - Bostwana)
- Construction of a new unit of vaccine: feasibility studies, Preliminary Project Summary 2005, Preliminary Detailed Project 2007, realization and assistance to prime contractor / work.
2007
MERIAL (Pirbright-England)
- Assistance to project management of a decontamination station.
2006
Institute PASTEUR (Cambodia)
- Design of a laboratory P3 (Avian Flu).
2005
SANOFI PASTEUR
- Study and implementation of the P3 confinement of a vaccine production area (Avian Flu).
-Design and follow-up of works, commissioning and qualification of an effluent decontamination station.
2003-2004
MERIAL ANIMAL HEALTH (England)
- Feasibility studies and global comparison of 3 solutions to increase the production capacity of an inactivated concentrated active principle of the exotic strain type.
2000-2002
MERIAL (Lyon Gerland)
- Construction of a new laboratory for the production of active ingredients by Ovoculture (ovoculture, purification, inactivation, distribution).